St. Augustine, Florida
SR 207 new construction began in August of 1989, and established a four-lane (future six-lane) capacity roadway that was ADA compliant with business and resident access taken into consideration. The end result was 5.3 miles in length. Lochrane provided design, utility coordination, public involvement, survey and post design services. Lochrane was able to overcome various obstacles during this project such as coordination with the CSX Railroad crossing, redesign of storm water ponds, deep outfall 72" pipe down county dirt road with narrow right of way, floodplains, environmental issues, and high water table. Due to existing conditions, the east end of the project storm water was permitted to directly discharge into the Matanza River and was compensated for throughout the other portions of the project. This project was completed in August of 1999.
|