Transportation Projects
South Street Realignment from Rosalind Avenue to Magnolia Avenue PDF Print E-mail


 

City of Orlando, Florida

Located in the heart of downtown Orlando, this project runs next to the new Dr. P. Phillips Performing Arts Center development that is underway and will all together be a signature element for the Orlando community. Lochrane is providing civil engineering, utility coordination and survey services on this significant project. 
 
Innnovation Way Phase II and Interchange PDF Print E-mail
Orange County, Florida

Lochrane is currently working on final construction plans for Phase II involving the interchange and extension of Alafaya Trail to Aerospace Boulevard with connection to ICP Boulevard. The interchange will include a four ramp connection to SR 528. The extension to Aerospace Boulevard will be a 4-lane divided roadway. Lochrane also provided Design Survey services.
 
Holden Avenue from John Young Parkway to Orange Blossom Trail PDF Print E-mail
Orange County, Florida

The Holden Avenue project started in 2004, and will provide additional east-west capacity for the motorists of Orange County. This will be accomplished through the extension of Holden Avenue from Texas Avenue to John Young Parkway and widening from 2-lanes to a 4-lane divided urban roadway from Texas Avenue to Orange Blossom Trail. Lochrane was able to provide survey services and preparation of complete construction and right-of-way documents. At completion, the project will produce 1.24 miles of 4-lane divided urban roadway. Holden Avenue is expected to be completed in early 2007.

For more information about Holden Avenue, please visit http://www.orangecountyfl.net/cms/AWARE/transportation/projects/holden/default.htm.

 
Curry Ford Road from Goldenrod Road to SR 417 PDF Print E-mail
East Orange County, Florida 

The Curry Ford Road improvement project is currently under construction, and will ultimately provide additional roadway capacity for motorists in east Orange County. This will be accomplished with 2.5 miles of widening from a 2-lane rural roadway to a 4-lane divided urban roadway.  Lochrane provided a number of services including comprehensive survey services, preliminary engineering and preparation of complete construction documents. Lochrane was able to serve the client by obtaining all environmental permits necessary to begin construction. Wetland impacts were mitigated using enhancement of existing wetlands in Hal Scott Preserve. This project is unique because it involved the widening of the bridge over the Azalea Park Outfall Canal.

 