| SR 93 (I-75) at US 441 (SR 25) Operational Improvements, FDOT District 2 |
|
|
|
|
Lochrane is performing a design survey at the intersection of Interstate 75 and US 441 in Alachua, Florida for this project to add a new ramp on Eastbound US 441 to Southbound I-75. This will also include a survey of the southbound lanes of I-75 beginning at the southbound off ramp and running one mile south. A survey will also be performed on US 441 running approximately 0.25 miles in each direction from the interstate overpass. The final field survey work will be to perform a topographic survey of the area bounded by the south bound off ramp, southbound I-75 and US 441. |
[corporate office]
201 south bumby avenue orlando florida 32803
phone : 407.896.3317 | fax : 407.896.9167
201 south bumby avenue orlando florida 32803
phone : 407.896.3317 | fax : 407.896.9167



