| ALAFAYA TRAIL EXTENSION PHASE I |
|
|
|
|
A 4.8 miles extension of Alafaya Trail from the intersection of Alafaya Trail and Avalon Park Boulevard south to 1000 feet north of the Beach Line (SR 528) on which Lochrane provided civil engineering and survey. A public/private partnership project with the Developer (ICP) paying for the design and permitting and dedicating the right of way necessary for the project, this project involved relocation of gopher tortoise and the red-cockaded woodpecker. The project is currently under construction and Lochrane will be providing post design services as requested. |