LinkIn with Us  Become a Fan on Facebook  Twitter  Follow our News Feeds

INNOVATION WAY-SR 528 INTERCHANGE PDF Print E-mail

Lochrane is currently working on final construction plans for this interchange and extension of Alafaya Trail to Aerospace Boulevard with connection to ICP Boulevard. The interchange will include a four ramp connection to SR 528. The extension to Aerospace Boulevard will be a 4-lane divided roadway, with the Aerospace Boulevard easterly extension to ICP Blvd being a 2-lane roadway. This project also involved Design Survey.

 

[corporate office]
201 south bumby avenue orlando florida 32803
phone : 407.896.3317 | fax : 407.896.9167